Indimic

UPPSC PCS Prelims 2024 Question Paper · Question 72 of 150 · Geography

Which one of the following pairs is not correctly matched regarding peculiarities of Ramganga project ?

  1. Dam's length – 825.8 metres
  2. Hydropower generation capacity – 198 MW
  3. Location – Garhwal (Uttarakhand)
  4. Irrigated area – 6 lac hectares

Answer

(a) Dam's length – 825.8 metres

Explanation

The Ramganga (Kalagarh) dam in Pauri Garhwal, Uttarakhand, is an earth-and-rockfill dam about 126–128 m high and roughly 626–630 m long – not 825.8 m. Its powerhouse has 3 × 66 = 198 MW capacity, and textbooks credit the project with irrigating about 6 lakh hectares in western UP.

← Question 71 – A bus covers the first half of a certain distance with speed v1 and the second half with a speed v2. The average speed…
Question 73 → – Consider the following statements with reference to cultivated area of some countries of the world : 1. In comparison…

All 150 questions of the UPPSC PCS Prelims 2024 Question Paper with answers

More Geography questions from this paper

  1. Q73 – Consider the following statements with reference to cultivated area of some countries of the world : 1. In comparison…
  2. Q74 – Match List-I with List-II and choose the correct answer using the codes given below the lists : List-I (Place) A.…
  3. Q75 – Consider the following statements with respect to the climate of Western Europe : 1. Western Europe receives rainfall…
  4. Q76 – Consider the following mountains and arrange them in correct order from West to East by their location : 1. Karakoram…
  5. Q77 – Which one of the following pairs (River – Direction) is not correctly matched ?
  6. Q78 – Which one of the following pairs (Country – Oil field) is not correctly matched ?